COURSE OUTLINE:
INTRODUCTION TO MICROSOFT PROJECT
• Describe how the Project relates to the discipline of Project management.
• Learn what the new features are in Project 2019.
• Navigate to the primary views available using the Ribbon.
• Choose Views that display task, resource, or assignment information.
• Select the table within views to change the information that is available to see and edit.
• Relate the features of the Project to the 5 steps for building a plan for Project.
• Learn new accessibility features in Project.
A QUICK AND EASY OVERVIEW OF MANAGING WITH PROJECT
• Create a new project and prepare it for data entry.
• Enter project tasks.
• Sequence the tasks.
• Define resources.
• Estimate Task duration and assign resources.
• Baseline the project.
• Track project progress.
SETTING UP A PROJECT
• Use multiple methods to create a new project from an Excel file and a SharePoint Tasks list.
• Establish one or more calendars to constrain resource availability.
• Configure Project to calculate the schedule from the Start Date forward, or from the Finish Date backward.
CREATING A WORK BREAKDOWN STRUCTURE
• Build and use summary and subordinate tasks.
• Understand and use milestones.
• Develop WBS Outlines.
• Assign completion criteria.
• Evaluate the WBS.
• Understand and use WBS templates.
IDENTIFYING TASK RELATIONSHIPS
• Understand the different types of task relationships.
• Understand and use various methods to create relationships.
• Determine and display task sequence.
• Understand and use lag, lead, and delay.
• Understand the new feature of Task Paths.
DEFINING RESOURCES WITHIN PROJECT
• Define resource types.
• Define individual resources that will be used on the project.
• Record the cost (s) of using each type of resource.
• Record the limit of availability for each type of resource by establishing a resource calendar and defining the maximum units of that resource.
MAKING WORK PACKAGE ESTIMATES
• Enter estimates for duration and costs for each task.
• Distinguish between task types and describe when each is appropriate.
• Describe the relationship between work, units, and duration.
• Describe the way Effort Driven scheduling is affected by work, units, and duration.
• Assign tasks to resources using the Team Planner view.
CREATING AN INITIAL SCHEDULE
• Calculate float and identify a project’s critical path.
• Understand and identify task constraints.
• Create milestones.
• Use the Task Inspector to troubleshoot the initial schedule.
CREATE A RESOURCE LEVELED SCHEDULE
• Adjust a project schedule to account for limited people and other resources.
• View the overall cost and schedule of a project.
• Identify resources that have been overallocated for a project schedule.
• Use multiple ways to adjust tasks and assignments to remove over-allocation for any resource.
MANAGING THE PROJECT
• Learn how to set a baseline.
• Lean how to enter and track project performance data.
• Learn how to apply different tracking methods.
• Learn how to perform a variance analysis on a project.
• Learn how to Reschedule Work.
• Learn how to inactivate tasks.
FORMATTING OUTPUT AND PRINTING REPORTS
• Views
• Formats
• Sorting
• Filtering
• Grouping
• Custom Fields
• Reporting
• Other File Formats
2023-07-21
Engr. Arif
MS Project course cost please .
2023-09-25
Kamrul Hasan
Course schedule time & course fee.
2023-10-09
Dr. Zahiduzzaman ZAHID
I learnt huge. I didn't attend all the classes but try to recorded lectures.
2023-10-10
Md. Ahsanul Hoque
It was a very helpful course who are doing different projects. I would like to thank Mr. Rana (Trainer) to answer each of our question and found knowledgeable person. I wish best of luck for Lean Sigma.
2023-10-13
Ashis Nath
Course fee details